Case study

Studer Hybrid + Lithium — Petroleum Project

Studer hybrid inverter/charger with lithium batteries for a petroleum-site power solution.

Oil & energyIndia2025Hybrid Power
Key outcomeHybrid + lithium continuity for petroleum site loads
LocationIndia
SectorPetroleum / energy
TechnologyStuder hybrid + lithium battery

Overview

Zigma engineered and commissioned a Studer hybrid power architecture with lithium battery storage for a petroleum project, combining solar/hybrid conversion, battery storage, and resilient backup for critical site loads.

Challenge

The site needed resilient hybrid power with lithium storage to support critical petroleum operations where grid quality and outages could disrupt production.

Solution

Deployed a Studer hybrid inverter/charger platform with lithium batteries, configured for hybrid energy management, seamless backup, and remote monitoring.

Scope delivered

System design support, Studer hybrid equipment supply/integration, lithium battery bank, commissioning, and handover documentation.

Outcomes

  • Reliable hybrid power continuity for petroleum site operations
  • Lithium storage for efficient backup and cycling
  • Remote-ready monitoring for operational visibility
Enquire

Discuss a similar scope for your facility

Share your requirements and our engineering team will respond with feasibility, timelines, and commercial options.

CallWhatsApp