Challenge
The site needed resilient hybrid power with lithium storage to support critical petroleum operations where grid quality and outages could disrupt production.

Studer hybrid inverter/charger with lithium batteries for a petroleum-site power solution.
Zigma engineered and commissioned a Studer hybrid power architecture with lithium battery storage for a petroleum project, combining solar/hybrid conversion, battery storage, and resilient backup for critical site loads.
The site needed resilient hybrid power with lithium storage to support critical petroleum operations where grid quality and outages could disrupt production.
Deployed a Studer hybrid inverter/charger platform with lithium batteries, configured for hybrid energy management, seamless backup, and remote monitoring.
System design support, Studer hybrid equipment supply/integration, lithium battery bank, commissioning, and handover documentation.
Share your requirements and our engineering team will respond with feasibility, timelines, and commercial options.